ReEnergy Power Plant
Location: Fort Drum, NY
Starts: 05/07/2024
Ends: 05/07/2024
Facility Closing Consisting of Power Generation, Yellow Iron, & Aggregate Handling, Featuring: (5+) Electrical Transformers to 66.4 MVA (New as 2015) • Control panels • Motor control centers (MCCs) • Electrical drives • (3) 1875 kva diesel AC generators • (2) Kalmar Ottawa 4x2 Spotter Trucks • Dresser Rand 61Mw turbine generator • Heat exchangers • Cooling towers • boilers • Gould water pumps • Caterpillar D8T & D8R dozers • Deere 850C dozer • Komatsu D155AX-6 dozer • Caterpillar 966K loader • Caterpillar IT28B loader • EMD switching locomotive • trucks • trailers • forklifts • welders • toolroom • motors • pumps • spares • monitoring equipment